|
|
![]() |
![]() |
![]() |
||
|
Fitting of
INVIS fasteners requires clean and accurately aligned drill holes (as
for dowels) in the 2 work pieces to be joined. Suitable are all stationary machines being employed for dowel hole drill holes. |
||||
![]() |
![]() |
![]() |
||
| The INVIS fasteners are screwed into the drill hole exactly perpendicular by means of the screw-in jig. | The INVIS studs are screwed into the drill hole exactly perpendicularly by means of the screw-in jig. | |||
![]() |
![]() |
![]() |
||
|
The centre drill jig assures an accurately
perpendicularly drill bore. Drilling depth for 8 & 12 mm fasteners is 41 mm |
The position of the joiner is transferred to the attaching piece with the dowel marker pin. | Use the inserting tool with the hand ratchet to insert the joiner through the mounting gauge. | ||
![]() |
![]() |
![]() |
||
| Prepare the bore for the stud. Pre-select the drilling depth with the drill stop. |
Drill hole depth for 8mm system: 10mm for 12mm system: 15mm |
Position elements, place INVIS actuator parallel to joiner axes. Keep switch pressed until a clear knocking sound indicates tightening of the joiner. |
||